Asphalt Production Plant & Revamping Pumping Station
Projects
Industries
Project: Major Refinery Expansion – Asphalt Plants & Pumping Station
1. Client & Facility Overview
Facility: High-Capacity Oil Refinery
Facility Details: A major industrial refinery with a substantial crude oil processing capacity of approximately 100,000 barrels per day.
2. Project Background & Objectives
As part of a strategic extension to increase the refinery’s production capacity and operational efficiency, this project consists of the execution of:
Erection of three (3) new Asphalt Plants.
Design and installation of a new, associated Pumping Station to support the new asphalt operations.
The siting of the new plant has been selected to strictly comply with all environmental and safety regulations, including a mandatory safety buffer zone from any residential areas.
3. Scope of Work: Control Valves & Instrumentation
Our defined scope of work for this project is the complete Engineering and Procurement (E&P) for the full instrumentation and control valve package required for the new Asphalt Plants and Pumping Station.
This scope includes, but is not limited to:
A. Engineering
Specification & Sizing: Complete engineering calculations for the selection and sizing of all new control valves (e.g., flow, pressure, level) based on process data.
Instrument Selection: Specification of all required field instrumentation, including transmitters for pressure, temperature, level, and flow.
Data Sheets: Creation of detailed, ISA-compliant instrument data sheets for all new tagged items.
Technical Evaluation: Performing technical bid analysis for all procured items to ensure compliance with project specifications.
Documentation: Providing all necessary engineering documents, including instrument lists, I/O lists, and hazardous area compliance reports.
B. Procurement
Sourcing: Procurement of all specified control valves, transmitters, gauges, and associated instrumentation from approved, world-class vendors.
Logistics: Full management of the supply chain, including inspection, expediting, and delivery to the project site.
Documentation: Compilation of a complete documentation package, including calibration certificates, material test reports (MTRs), and hazardous area (ATEX/IECEx) certifications.